Deutsch English
 Contact    Imprint  
 
The Eco-friendly Foundation: Straightforward and Quick Installation!

Completed in just one day: Delivered in the morning with power being generated by evening.

First a pit is dug out with an excavator and then the Steel Root is set up quickly in just a few steps. The Steel Root is installed and ... [Read more]


Home

News


The Eco-friendly Foundation: Straightforward and Quick Installation!

Completed in just one day: Delivered in the morning with power being generated by evening.

First a pit is dug out with an excavator and then the Steel Root is set up quickly in just a few steps. The Steel Root is installed and aligned in the pit with the aid of the excavator or a wheeled loader. Afterwards, the excavated soil is filled back in place and compressed in layers using a vibratory plate/ compactor. The masts are delivered in segments, which may be up to four meters in length in order to save, on the one hand, space during transport and decrease storage costs and, on the other hand, to allow for different overall mast lengths. The masts can be adapted individually to a total height of 8, 10 or 12 meters and screwed together on site. The wind turbine can now be mounted. With the aid of the hinge at the base of the main mast, it is easy to raise the entire mast including the wind turbine and then lower it again for any possible maintenance work. Set-up is usually implemented by means of the excavator that was used to excavate the pit.

Picture Gallery "Wind Turbines"




Previous news


2012-02-06 Pilot Batch for Steel-Root completed successfully!

2011-10-26 Finalist at "Hessen-Champion" Award 2011

2011-09-20 110 Megawatts of Solar Output Surpassed

2011-09-15 New BFtec Website online


We will be pleased to advise you with our MAMMUT fundaments.
Call now: +49 6627 915170

 


BFtec GmbH • Am Sonnenhof • 36214 Nentershausen, Germany • Phone: +49 (0) 66 27-915170